TGB13 tunnel rebuild

So waiting for the PAS box to return I turn my attention back to the tunnel.

looking for maximum access the panels will be detachable.  Captive nuts and bolts

image

image image

 

 

image

 

image

 

 

 

 

image

 

So cutting the holes for the controls was a bit of a faf.  Case of measure 27 times cos you only get to cut once.

turns out I’ve made the well for the gearbox control too shallow so had to come up with a way of spacing it out.  Looked for ages for a material that is not steel but also will not rot – like wood.  Found something called No More Ply which claims to be pretty much inert.  stuck some in a a bucket of water overnight and fair enough.  It’s almost ceramic but not quite.  Anyway it works well for this.

Decided there was too much dead space under the engine cover so have created the hole for the sunken shelf.

image image image image image image

Tray tacked in place

image

Finished the tunnel.  Ran out of screws and screw cups but all done.

 

 

image image (3573)

Likes(14)Dislikes(0)

Leave a Reply